로고

Gardyon Charcast7

Gardyon Charcast7 System Arrangement

Application Photo

Site Survey for the material production
Application Photo
Application Photo
All the Obstructions are checked before produce the materials
Surface preparation, Scaffoling installation
Application Photo
Application Photo
Surfaces have to be dried and cleaned.
Work in high places need to install scaffolding
(can not work with ladders)
Obstacle modificaion, Landing point prepararion
Application Photo
Application Photo
Application Photo
Application Photo
Obstructions have to be modified before install the Charcast.
The landing points should be prepared even
Material Preparation
Application Photo
Application Photo
Application Photo
Application Photo
Materials should be handled carefully
Install the Charcast
Application Photo
Application Photo
Application Photo

For more information, kindly fill out the form below,
and we will get in touch with you shortly.

or call us at +82 55 632 4928 (Korea) / +60 3 27856806 (Malaysia)